The subscription is public and fixed. Equipment and installation are quoted per site against the saving we measure there — so the payback is documented before you sign. Every plan starts with 14 days free: the card is stored with Stripe at sign-up and the first charge lands on day 15. Cancel any time before that and nothing is charged.
VX-MV, VX-CT, CHR and CHR are engineered against your flue, your fuel and your steam load, so they carry a project price rather than a list price. The quote is built in this order:
| Step | What we do | What you receive |
|---|---|---|
| Survey | Flue temperatures, O₂, fuel and steam baseline, space for the bundle | Measured baseline and a go / no-go on recovery |
| Model | Stage sizing at your load profile, materials, drain route | Predicted saving per stage, with uncertainty stated |
| Quote | Hardware, installation, commissioning, PULSE | One number, and the payback that follows from it |
| Verify | First 30 days of measured operation | Actual saving against predicted — in writing |
No price is quoted for hardware before the survey. A vendor that quotes a percentage for a plant it has never seen is guessing.