MV & CT

Measure it, then burn it properly

Two modules that sit either side of heat recovery: metering that makes the saving auditable, and combustion tuning that stops the burner wasting what recovery would have caught.

5measured streams in the MV package
1 minsampling interval at the gateway
3.2 %O₂ target in the flue after tuning (band 3.0–3.5 %)
3load bands tuned on the burner

Where each one sits

StageModuleWhat changesWhat it gives you
1VX-MVInstruments and gateway are fitted; the baseline is logged A saving you can invoice, defend and re-derive
2VX-CTO₂ trim, excess air and fuel/air curves are tuned in three load bands Less excess air, lower dry flue loss, a stable burner
3CHRFront-stage economizer takes the gas to ~77–49 °C 5.92 % of fuel measured on this plant
4CHRCondensing stage takes the gas to ~45 °C +2.55 % of fuel, plus recovered water

The two modules in detail