Everyone looks at the stack first, and they should. But a steam plant throws heat away in at least four other places, and the same meters that prove flue recovery can prove these too.
Published 17 November 2026 · about 6 minutes · sources listed at the end · Vegax Energy is a system integrator: the equipment belongs to the manufacturers cited, the integration and the measurement are ours.
Stack loss dominates because the mass is large and the temperature is high: on our demo plant the flue leaves the boiler near 187 °C for most of the year. That is why the first two stages of recovery live there (CHR and CHR).
Everything below is smaller individually, and worth doing when the flue project is already open and the pipework is being touched.
Boilers reject a fraction of the drum water to control dissolved solids. That water is at saturation temperature and at pressure, so it flashes to steam the moment it is let down. A blowdown heat exchanger recovers the above-dew-point part into make-up water; the flash part can go to a low-pressure main. The fraction is small — a few percent of steam output — but it runs every hour of the year, and the water leaving the plant is also water you paid to treat.
Condensate at pressure holds more energy than condensate at atmospheric. Let it down through an orifice and part of it flashes; that flash is steam you can still use. The flash steam reference from Spirax Sarco sets out the calculation, and the practical conclusion is usually the same: return condensate as hot as possible, and where you must let it down, do it into a flash vessel rather than a drain.
Hot condensate returning at 90–95 °C instead of cold make-up is itself a saving — every degree you do not have to add back is fuel you do not burn.
Two more sources show up in almost every plant we survey. Compressed-air heat is available at 70–90 °C from the oil circuit and is easy to put into wash water or space heating. And on hot-water systems the loop itself is an opportunity: if the return comes back hot because the terminal units are badly balanced, no amount of recovery equipment will condense anything.
We treat these as one system, not four projects: the same metering package measures all of them, and the savings page reports them separately so a weak source cannot hide inside a good one.
The order that keeps the economics honest: fix combustion first (the cheapest fuel saving), then recover the flue in two stages, then pick up blowdown and flash where the pipework is already open, then look at compressed air. Doing them in that order means each project is measured against a baseline that already includes the previous one — which is why our protocol insists on a re-baseline after every change.