MEASURED · REFERENCE INSTALLATION · US, USD
CHR — condensing heat recovery, two-pass condensing

Northline Foods, United States: two-pass condensing, four boilers, 8.47 % of the fuel measured

A US food plant with four gas-fired boilers, flue gas leaving near 187 °C, and no way to prove what recovery was worth. We instrumented the plant, ran the baseline, then added recovery in two stages and published the meters.

01 · Plant profile

Plant profile

CustomerNorthline Foods · United States (demo tenant, plant code withheld)
ApplicationFood processing · 4 gas-fired steam boilers · two-stage flue-gas recovery
BoilersUB-01 1,500 kW · UB-02 2,500 kW · UB-03 4,000 kW · UB-04 6,000 kW — 14,000 kW installed
Recovery equipmentCHR (above-dew-point) + CHR (condensing) + VX-MV metering, DXL two-pass condensing family
Flue gas path187 °C at the boiler outlet → 110 °C after the dry stage → 45 °C after condensing
Heat sinkBoiler feedwater and process make-up water, cold enough to take the flue below its dew point
MeasurementFuel, steam, flue in/out, water in/out, condensate — 1-minute samples
DataPublic dashboard · M&V protocol (IPMVP option B)
02 · Baseline — before recovery

Baseline — before recovery

Before recovery the four boilers sent their flue gas to the stack at close to 187 °C. The plant had no way to say what that waste heat was worth, and no way to prove a saving afterwards: the fuel invoice moves for reasons that have nothing to do with a boiler house.

The baseline was therefore a measurement, not an estimate. Fuel input, steam output, flue temperature in and out, water in and out, condensate were sampled once a minute across the normal load profile before any recovery equipment was commissioned.

03 · Solution — what was installed

Solution — what was installed

CHR takes heat above the water dew point from the flue into the feedwater, 187 °C down to about 110 °C. CHR is the two-pass condensing stage: the flue is taken below its water dew point so the latent heat of the flue moisture is recovered and the water condenses out on the second pass. VX-MV meters the boundary, including the condensate drain.

Two passes rather than one moves more of the flue gas into contact with the condensing surface, which is why the latent share here (2.55 %) is slightly higher than on a single-pass installation of similar size.

above-dew-point stage — CHR

Flue gas 187 → 110 °C. Heat into feedwater, no condensate. This is the stage a conventional economizer already delivers.

Condensing stage — CHR

Two-pass condensing, flue gas 110 → 45 °C. Latent heat plus the condensed water, metered on the drain.

Two-stage cutaway of the DXL condensing economizer: two tube bundles in series inside one casing, flue-gas flow arrows through both passes, and a condensate drain at the base of the second stage
Two-stage cutaway: stage 1 dries the gas, stage 2 crosses the dew point and drains the condensate. Equipment reference: Cain Industries.
04 · Live process values

Live process values

Seven points on the two-stage loop are instrumented: four temperatures — flue gas in, flue gas out, water in on the cold make-up line and water out on the heated feedwater line — plus steam pressure at the boiler, circulating water flow and condensate flow. The four temperatures are the points a real installation needs in order to prove recovery on both the flue side and the water side; the three flows are what shows the unit is actually working rather than merely warm. All seven sit on the vendor’s own DXL P&ID, where both heat sinks of the two-stage unit — boiler feedwater and cold make-up water — are drawn, so the position of every point is unambiguous.

The readings below are the PULSE demo plant for Northline Foods — a simulated model of the Cain DXL two-stage unit, refreshed every five seconds from the PULSE data service. They demonstrate the measurement points and the trend; they are not the measured installation reported in the sections above. Circulating water flow and condensate flow have no field instrument in the model — they are derived from the live temperatures and the flue moisture, and the feed publishes them as modelled values.

Demo plant · simulated sensor data—
Cain Industries P&ID for preheating boiler feedwater and cold makeup water with a condensing heat exchanger — the two heat sinks of the DXL two-stage unit. Flue gas leaves the boiler, passes up through the exchanger to the stack (flue gas in and out), feedwater is heated and returned to the boiler (water out) while cold makeup water enters on the make-up line (water in); steam header, condensate drain and boiler feed pump are drawn. Seven process values are live.
—°C
—°C
—°C
—°C
—bar
—kg/h
—m³/h
05 · Measured results

Measured results

Measured on the plant meters across the normal load profile, with both stages running and condensate proven on the drain. One set of readings, expressed in three unit systems.

8.47 %of the fuel bill saved — measured, both stages
5.92 %heat above the water dew point — CHR
2.55 %latent heat and water — CHR
$28,420annual fuel saving, measured
Measured on the plant meters · one set of readings, three unit systems
QuantityUnited StatesVietnamOther (metric)
Recovered duty2,630,078 BTU/h · 2.63 MMBtu/h771 kW · 6,166 MWh/yr771 kW · 6,166 MWh/yr
Flue gas temperature369 → 113 °F187.2 → 45.0 °C187.2 → 45.0 °C
Annual fuel (as saved)263,008 therm27,747 GJ · 6,166 MWh22,199 GJ
Annual saving$28,420747,446,000 VND€26,146 · £22,452
CO₂ avoided98.2 short tons89.1 tonnes89.1 t
Recovered duty2,630,078 BTU/h771 kW771 kW
06 · Savings and payback

Savings and payback

The plant bills in dollars, so the saving is reported in dollars at the plant’s own fuel price. The VND and euro columns are conversions at a declared rate (1 USD = 26,300 VND).

5.92 % of the fuel bill comes from the above-dew-point stage alone — that is what a dry economizer of this size would have delivered. The remaining 2.55 % exists only because the flue was taken through condensation, and the condensate meter is the evidence for it.

Payback

This is our own reference installation rather than a customer purchase, so there is no invoiced installed cost to quote and no payback figure on this page. Installed cost for a customer project is quoted per site after the survey — see pricing.

07 · Verification method

Verification method

Fuel meter and steam meter give the efficiency before and after; flue temperatures and water flow give the recovered duty; condensate mass flow proves the latent stage is running. Everything is sampled once a minute, buffered at the gateway and published, so the percentage can be re-derived by a third party from the raw record rather than taken from a summary table.

The boundary is IPMVP option B: one boundary around the boiler house, all fuel and all steam inside it. The method is published in the M&V protocol.

08 · Before and after

Before and after

Before
187 °C
flue gas straight to the stackfuel bill 100 %
→
After
45 °C
8.47 % less fuel$28,420 a year
After the retrofit: wet condensing fin-tube surface of the second pass of a two-pass heat-recovery economizer (before, flue gas left near 187 °C)
The wet condensing surface of the second pass — where the latent share is actually collected.Photo: Cain Industries
09 · Download, sources and what this document is

Download, sources and what this document is

What this document is. Our own instrumented reference installation — real meters, real readings, public dashboard. It is not a customer site and no customer name appears on it.